The Projects section of this website is designed to provide clients and perspective customers with an insight to past, present and future projects that Energy Task Force LLC. has navigated and/or participated in. Inside each individual project subsection you will find specific information about each project such as:

Project Names and Locations
Installed Piping System ( Type and Pipe Length )
Project Consultant
Project Owner


      

Mechanical Contractor Coastal Mechanical Service,
working in conjunction with General Contractor Klewin Company,
installing 20" pipe with minimal disruption to Florida Atlantic University campus operations.





Crews unloading 1st of 7 truckloads ETF-MT 20"
pre-insulated steel pipe with high density polyethylene outer
jacket. All pipe shipped in 42' lengths resulting in less field labor.







Final tie-in of 20" pipe to North valve pit witnessed
by consulting engineer John Pruett of TLC Engineering for Architecture.
Coastal Mechanical and Energy Task Force install over 2000 linear
feet 20" ETF-MT pre-insulated pipe in 2 weeks
.